The Virginia Passenger Rail Authority (VPRA) has completed 30% design on the Long Bridge project which includes a Bicycle and Pedestrian Bridge that connects directly to the Mount Vernon Trail. The design will be shared during public engagement meetings in March. The Long Bridge Project will double existing rail capacity, creating a four-track corridor, by constructing approximately 1.8 miles of improvements, including a new two-track railroad bridge across the Potomac River, five rail bridges, bicycle and pedestrian bridges, and related railroad infrastructure. The Project serves to increase capacity and improve passenger rail operations.

The following engagement opportunities are planned:
March 15 (3:30-6:00 PM): VRE Crystal City Station Entrance, 1503 Crystal Dr, Arlington, VA 22202
March 21 (3:30-6:00 PM): VRE L’Enfant Station, 650 Virginia Ave SW, Washington, DC 20024
March 25 (1:00-3:00 PM): Long Bridge Aquatics and Fitness Center, 333 Long Bridge Drive, Arlington, VA 22202
March 27 (6:00-7:00 PM): Virtual Public Meeting, Click here to register.
April 1 (9:00 AM-1:00 PM): Farmers Market SW, 4th and M St. SW, Washington, DC 20024
VPRA’s project page is at vapassengerrailauthority.org/LongBridgeProject.
The Friends of the Mount Vernon Trail needs your help to continue improving the trail. Sign up for a volunteer trail improvement event or Donate to Friends of the Mount Vernon Trail to help us purchase tools and supplies.