Boundary Channel Drive Trail

VDOT’s project to redesign the interchange on Boundary Channel Drive will result in a new trail connecting Long Bridge Drive to the Mount Vernon Trail. Other changes include:

  • Reducing Boundary Channel Drive from four lanes to two in order to construct a ten-foot-wide sidewalk along eastbound Boundary Channel Drive and a ten-foot-wide shared-use path along westbound Boundary Channel Drive
  • Installing roundabouts on Boundary Channel Drive just west and east of I-395
  • Reconfiguring the ramps between I-395 and Boundary Channel Drive
  • Adding crosswalks along Boundary Channel Drive

VDOT Project Site: http://www.virginiadot.org/projects/northern-virginia/boundary-channel-at-i-395.asp

Arlington Project Site: https://projects.arlingtonva.us/projects/boundary-channel-drive-interchange/


Boundary Channel Drive Trail Connection Plans Are Much Improved

Updated plans for the Boundary Channel Interchange Improvement Project were presented at the Arlington County Transportation Commission Meeting on April 28th, 2021. The project includes building a multiuse trail connecting Long Bridge Drive near the aquatics center to the Mount Vernon Trail. The plans incorporate several improvements requested through public outreach. Major changes to the…

Loading…

Something went wrong. Please refresh the page and/or try again.


Follow My Blog

Get new content delivered directly to your inbox.